Mechanical & Electrical Case Studies | The Shore Group

One of the UK's fastest growing Recruitment Agencies

Mechanical & Electrical Case Studies

Professional recruitment services for specialist contractors

We have relationships with a broad range of clients, and these are just some of the projects with which The Shore Group have been involved in the last 12 months.

University of Brighton Varley Halls of residence redevelopment

Value £14 million

The Shore Group supplied mechanical and electrical trades for phase 1 and 2 and are currently supplying for phase 3 of the construction of four separate student residential buildings providing a total of 197 bedrooms.

Varley Park

Shangri La Hotel, The Shard

We supplied Mechanical and Electrical trades for a large scale fitout of the hotel, located in one of London’s newest landmarks – The Shard. Our operatives worked on a number of tasks, including wiring and plumbing for the bedrooms and bathrooms.

Shangri La Hotel The Shard case study

The Walkietalkie & The Cheesegratter

The Walkietalkie @ 20 Fenchurch & The Cheesegratter @ 122 Leadenhall Street are two of London newest most architecturally inspiring designs.

The shore Group are pleased to be working in partnership with some of London leading Mechanical & Electrical fit out contractors to assist with the supply of over 20 operatives working on both of these prestigious projects.

The Walkie Talkie and Cheesegrater

15 Canada Square, the new Canary Wharf ‘hub’ for KPMG

15 Canada Square, the new Canary Wharf ‘hub’ for KPMG has been described by Estates Gazette as “one of the most ambitiously ecological office developments in the country”.
Up to 40 Electrical operatives supplied

Canada Square KPMG case study

Project Fox, 320,000 square foot Santander data centre facility

Contractor: ISG / Mace

Value: £162,000,000

The scheme entailed the development of 2 identical Data Centres. Each building has 4 levels. Levels 1 & 2, which are below ground level, contain the computing equipment. Level 3 & 4 house the electrical and mechanical infrastructure. It has been constructed to LEED Gold standard. We were trusted with the task of placing highly skilled mechanical & electrical operatives that were key in the delivery of installation of the
building services on the project with the exception of the fire safety systems. This scope included the LV panels supply, power bar and the Scada/EMS install and commission for the entire system and IT infrastructure
The Mechanical Scope included chilled water systems, supply and extract ductwork, fire suppression systems and domestic services. At any one time up to 32 of Shore Group supplied mechanical operatives were responsible for installing prefabricated stainless steel pipework.

Santander Data Case Study

De Vere Gardens, Kensington, London

We have supplied mechanical operatives including supervisors, Pipefitters, Plumbers to this high end residential including a sophisticated energy centre located in the heart of building.

De Vere Gardens Case Study

Southbank Tower, Blackfriars

Contractor: Mace

Value: £130,000,000

In partnership with a principle M & E contractor this residential project consists of the fit out to 155 luxury apartments in the existing Kings Reach Tower along London’s Southbank. Due for completion in 2016 we have secured works for mechanical and electrical operatives that will assist in the installation of fan coil units, HIU’s, mains water distribution, drainage, BMS, heat recovery ventilation, electrical distribution, small power, lighting & lighting control, data, and small power.

Santander Data Center

GlaxoSmithKline, Ware, Hertfordshire

We supplied over 30 qualified installation electricians on this new-build pharmaceutical facility, undertaking the installation of complex electrical control and lighting systems.

GlaxoSmithKline Ware case study

New BBC Headquarters, Portland Place, London

We have sourced qualified labour for the mechanical installation contractor, including lift-drivers and banksmen, working on both pre-fabricated sections and bespoke installation of heating and ventilation systems, as well as large-scale, industrial plumbing and fabrication.

New BBC Headquarters London case study

Canary Wharf, DS2 & DS3

The Shore Group provided both skilled and unskilled labour to assist with the installation of the generator and power systems, ensuring full compliance with all the necessary security and vetting procedures.

Canary-Wharf-DS2-DS3-case-study